Contract or ad-hoc · fully insured

Planned electrical maintenanceacross Chepstow, Newport, Bristol & South Waleskeeping installations safe and compliant.

Scheduled electrical maintenance for landlords, commercial premises and industrial sites. Reactive call-out cover, EICR cycles, emergency lighting tests and remedial works, under contract or ad-hoc.

NAPIT registered · fully insured · out-of-hours cover available

15+ yrs
Combined experience across Levi & Jay
NAPIT
NAPIT registered
Ohme
Accredited EV charger installer
5.0 ★
Google reviews from real customers
Insured
Public liability · employers' · indemnity
Overview

What this service is, and who it's for.

Straight explanation, no jargon padding, so you can decide whether it's the right call before you even ring us.

What it is
Planned electrical maintenance is a scheduled programme of inspection, testing and remedial work designed to keep a fixed electrical installation safe, compliant and operational. That includes regular EICR cycles, monthly and annual emergency lighting tests, thermal inspection of distribution boards, tightening of terminations, replacement of consumables (lamps, RCDs at end of life), and reactive cover for faults between scheduled visits.
Who it's for
Landlords with multiple properties who want their EICR cycles and remedial works handled predictably. Commercial premises with insurance-mandated periodic testing. Industrial sites where downtime is expensive. Managing agents looking after mixed-use portfolios. Anyone who wants electrical safety to be a scheduled programme rather than an emergency phone call.
When you need it
A maintenance contract is worth it when reactive call-outs are stacking up, when you have a portfolio that makes ad-hoc invoicing painful, or when your insurer is asking for evidence of scheduled testing. Start with a site audit, we'll tell you honestly whether contract or ad-hoc is the right fit.
Why professional matters
Planned maintenance costs less than reactive fire-fighting over the life of an installation. It catches loose terminations before they burn, RCDs before they stick, and EICR issues before they turn into a failed report a week before a tenancy renewal.
What happens if you leave it

The cost of putting it off is rarely just money.

Electrical installations don't fail politely, they fail on the day the tenant moves in, the shop opens for Christmas trading, or the insurer runs a spot audit. Every failure is more expensive than the maintenance visit that would have caught it.

What can go wrong

  • Failed EICR at a change of tenancy blocking a rental from going back on the market.
  • Insurance claims contested because there's no evidence of scheduled testing.
  • Emergency lighting failing on the day of the fire risk assessment.
  • Distribution board fires from loose terminations that thermographic inspection would have caught.
  • Cumulative call-out fees exceeding the cost of a maintenance contract.

Common mistakes we see

  • Waiting for the 5-year EICR deadline instead of scheduling around tenancy changes.
  • Skipping monthly emergency lighting flick-tests because 'they always pass'.
  • Treating a maintenance contract as a fixed price for infinite work, no honest provider does that.
  • Not documenting what's been tested and when, audit trails matter.
  • Using different contractors for reactive and planned work, no one owns the installation history.
How we work

A five-step system, so nothing gets missed.

The same discipline we run on a single-socket call-out and a full commercial fit-out. Predictable, documented, tidy.

  1. 01

    Inspection

    Free on-site survey. We look at the existing installation, the space and the outcome you need, no pressure, no obligation.

  2. 02

    Diagnosis & fixed quote

    We scope the work, agree the spec in plain English and give you a fixed-price written quote with no hidden extras.

  3. 03

    Booked-in works

    We turn up when we say we will, protect the space with dust sheets and keep disruption to your day to a minimum.

  4. 04

    Testing & verification

    Every circuit is tested to BS 7671 (18th Edition). Nothing gets signed off until the readings are right.

  5. 05

    Certification & handover

    You get NAPIT-backed certification, a tidy handover and a clear explanation of what's been done and why.

Benefits

What you actually get from doing this properly.

One contractor owns the installation

We build a history of the installation so faults are diagnosed against known-good baselines, not from scratch.

Predictable cost

Scheduled visits, fixed-price remedials, transparent reactive rates. No mystery invoices.

Insurer-friendly documentation

Test results, EICR cycles, emergency lighting logs, all documented and issued after each visit.

Priority reactive cover

Contract customers get priority in the diary for reactive faults, we're on site faster.

Emergency lighting compliance

Monthly flick-tests and annual duration tests scheduled and documented to BS 5266.

Thermographic inspection option

Distribution board thermal scans on annual visits catch loose terminations before they cause fires.

Detail

Materials, methods and the variations that matter.

The specifics, so you can compare us like-for-like against anyone else you're quoting against.

Working across:

Chepstow · Newport · Bristol · Cardiff · Bath · Gloucestershire · Caldicot · Magor · Undy · South Wales · South West

Contract structure

Maintenance contracts are structured around your installation and use pattern. A typical structure includes: EICR cycles at the required interval (usually 5 years for domestic rentals, 3–5 years for commercial), annual visual and thermographic distribution board inspection, monthly emergency lighting flick-tests and an annual duration test, and priority reactive cover at agreed rates. We agree the scope on paper, no surprises.

What we test and record

On each scheduled visit we record: distribution board condition, thermographic scan results where included, RCD trip-time tests on a sample of circuits, emergency lighting test results, insulation resistance readings on any circuit flagged from the previous visit, and any consumable replacements. Everything is logged and issued to you after the visit, audit-ready.

Reactive cover and out-of-hours

Contract customers get priority scheduling for reactive call-outs and access to our out-of-hours cover for loss-of-power and fault situations. Reactive rates are agreed in writing as part of the contract.

Landlord portfolios

For landlords with multiple properties we schedule EICR cycles around tenancy renewals rather than a rolling calendar date, so reports land when you actually need them. We produce reports in the format your council and insurer expect, and we quote remedials at a fixed price so budgeting is straightforward.

Commercial and industrial sites

For commercial and industrial premises we can include: emergency lighting compliance to BS 5266, fire alarm interface inspection (co-ordinated with your fire alarm contractor), containment inspection in plant rooms, and thermographic scans on distribution boards. Contracts are shaped around trading hours and insurer requirements.

Answers

Common questions on this service.

Still unsure? Ring us on 07491 966787 , surveys and quotes are free.

How much does a maintenance contract cost?+

Contracts are priced against the installation and the scope, number of properties, testing frequency, emergency lighting count, thermographic inclusion. We'll do a free site audit and quote transparently, so you can compare against your current spend.

Do you cover multiple properties on one contract?+

Yes, landlord portfolios are one of the main reasons customers move onto a contract. We schedule EICR cycles around tenancy renewals rather than a fixed calendar date.

What's included in a typical annual visit?+

Visual inspection, distribution board check, thermographic scan where included, RCD trip-time tests on a sample of circuits, emergency lighting duration test, and any consumable replacements. Everything is logged and issued to you after the visit.

Do contract customers get priority for reactive call-outs?+

Yes, contract customers get priority scheduling for reactive faults and access to our out-of-hours cover. We're on site faster.

Can you cover emergency lighting only?+

Yes, some customers just want their emergency lighting monthly flick-tests and annual duration tests handled on a schedule. We'll price that as a standalone contract.

What happens if we're outside your usual area?+

We cover Chepstow, Newport, Bristol, Cardiff, Bath, Gloucestershire, Caldicot, Magor and Undy plus surrounding South Wales and South West. For sites just outside, ring us, most of the time we can still make it work.

Can we mix contract and ad-hoc?+

Yes, many customers have a contract for the compliance work (EICRs, emergency lighting) and pay ad-hoc for one-off jobs. Whatever fits your operation.

Do you handle remedial work discovered during testing?+

Yes, remedials are quoted at a fixed price so you know exactly what the fix costs before we do it. No open-ended day rates on contract remedials.

Are you qualified and insured?+

Yes. H&H Electrical is NAPIT registered, our EV work is NAPIT-accredited and Ohme approved, and we carry public liability, employers' liability and indemnity insurance in full.

Do you cover my area?+

We cover Chepstow, Newport, Bristol & across South Wales, the South West, Cardiff, Bath, Gloucestershire, Caldicot, Magor and Undy. Ring us if you're just outside, most of the time we can still help.

How do I pay?+

Bank transfer or cash. We don't take card. Small jobs are call-out plus materials; larger jobs are quoted at a fixed price up front so you know the total before we start.

5.0 on Google · NAPIT registered

Ready for a straight quoteon planned electrical maintenance?

Free survey. Fixed-price written quote. Work booked in around you, usually the same week.

Free survey · fixed-price written quote · payment by bank transfer or cash